Image for illustrative purposes only.
Resources
Environmental Impact Statement
-
Environmental Impact Statement
-
EIS Appedix A – EA Requirements
-
EIS Appendix B – Proposed Layout
-
EIS Appendix C – Consultation
-
EIS Appendix D – Biodiversity
-
EIS Appendix E – Aboriginal Cultural Heritage
-
EIS Appendix F – Visual
-
EIS Appendix G – Noise
-
EIS Appendix H – Noise Management
-
EIS Appendix I – Environmental
-
EIS Appendix J – Hydrological
-
EIS Appendix K – Mineral Titles
Response to Submissions
-
RTS Wellington SF_RTS
-
RTS Appendix A – Mitigation Measures
-
RTS Appendix B – Additional Traffic Counts
-
RTS Appendix C – Biodiversity Offset Strategy
-
RTS Appendix D1 – Geotechnical Report
-
RTS Appendix D2 – Soil Survey
-
RTS Appendix E – Hydrological and Hydraulic Analysis
-
RTS Appendix F – Aboriginal Cultural Heritage Assessment Report
-
RTS Appendix G – Mayors Letter of Support
-
RTS Appendix H – Updated Constraints Map
-
RTS Appendix I – Council Consultation
-
RTS Appendix J – Modeling Resources Correspondence
-
RTS Appendix K – Drummond West Correspondence
-
RTS Appendix L – Boral Correspondence
Modification 1 – Substation Expansion
-
Mod 1 Application Report – Substation Expansion
-
Mod 1 Amendment Letter
-
Mod 1 Amendment Letter Annex A – Drawings
-
Mod 1 Amendment Letter Annex B – BAM Credits
-
Mod 1 Amendment Letter Annex C – RAP Consultation
-
Mod 1 Amendment Letter Annex D – General Layout
-
Mod 1 DPIE Assessment Report
-
Mod 1 Consolidated Consent
-
Mod 1 Instrument of Modification
NOTICE OF OWNERSHIP CHANGE – WELLINGTON SOLAR FARM
The community is advised that ownership of Wellington Solar Farm has transitioned from Lightsource bp to Aula Energy.
All existing planning approvals, development consents, and environmental management obligations remain in full force and are unaffected by this change. Aula Energy has assumed responsibility for the ongoing operation, management, and compliance of the project.
What this means for the community:
- All conditions of consent and management plans continue to apply.
- Existing environmental commitments and monitoring programs are unchanged.
- Emergency response arrangements remain in place during the transition period.
Updated contact details:
- General enquiries: 1300 431 993
- 24-hour operations: [email protected] | 1800 968 181
- In an emergency, call 000
Management plans and project documentation are being updated to reflect the new ownership and will be made available on this website as they are finalised.